RIGSDOM · H₂S sour service drilling rigs

Sour service

H₂S sour service drilling rigs

Drilling a sour well is a materials problem before it is an operational one. Units in the fleet carry H₂S spools to NACE MR-01-75, and the sour service programme, detection layout and contingency plan can be prepared for your well before the rig moves.

H₂S sour service drilling rigs — RIGSDOM land drilling fleet, Hamriyah Free Zone, Sharjah

What sour service actually requires

H₂S attacks steel through sulphide stress cracking, and the failure mode is sudden. Compliance is not a single certificate but a chain of decisions:

Which units are suited to sour work

Two units carry H₂S spools per NACE MR-01-75 as standard, both with mud gas separators and gas detection fitted. Where a well requires sour service on a unit not currently equipped, the modification scope and cost can be quoted with the rig.

The judgement to make is not simply which rig is labelled sour, but whether the whole system — materials, detection, mud, layout and crew training — matches the concentration you expect. A rig with the right spool and untrained crew is not ready.

Preparing the sour programme before you spud

The engineering suite on this site prepares an H₂S contingency plan and sour service programme covering detection set points by location, alarm levels with the action for each, SCBA counts, briefing area placement, NACE materials verification, scavenger treatment, drill schedule, medevac routing and a pre-spud checklist an auditor can walk.

It is written to API RP 49 and API RP 55 with the standards cited by number, and issued as a watermarked PDF.

Matching units

Common questions

Which rigs are certified for H₂S service?

Units carrying H₂S spools per NACE MR-01-75 are marked H₂S service in the fleet listing. Both are equipped with mud gas separators and gas detection.

Can a rig be upgraded for sour service?

In most cases yes. The scope covers wellhead and BOP materials, spools, elastomers, detection and mud system provision. The scope and cost are quoted with the unit.

Can RIGSDOM prepare the H₂S contingency plan?

Yes. The engineering suite prepares a full sour service programme to API RP 49, including detection set points, alarm response levels, SCBA counts, materials verification and a pre-spud checklist.

Talk to the desk

Tell us the well, the location and the timing, and we will come back with the units that fit, the delivered price or day rate, and the technical data pack.